PROJECT – RENOVATING & MODERNIZING TAIFA HALL – UNIVERSITY OF NAIROBI
Funded by The FORD Foundation Kenya, LED POWER TECHNOLOGIES (EA) K LTD was tasked with revamping the Famous TAIFA HALL at the historic Mahatma Gandhi wing in The University of Nairobi.
The summarized scope of work entailed:
- Design, Supply & Install New Main LV Switch Board c/w Metering Panels to supply the whole of the Mahatma Gandhi wing Load (2No Lifts, Taifa Hall Loads, 3 Floors Office Loads, etc.)
- Laying of new 300mm Main Incomer Armoured Cable to the New LV Board.
- Supply & Installation of several DBs with necessary cabling on each Floor at the Mahatma Gandhi Wing building.
- Supply & Installation of 3D STAGE CONTROLLED, AV TECHNOLOGY Stage Lighting Fixtures & Fittings at TAIFA HALL.
- Supply and Mount 3D Logo Cut-Outs Back Lit Light Boxes at TAIFA HALL,
- A fresh Coat of Paint and rebranding of the Back Wall so as to give the stage a different feel.
The successful completion of this project was a result of Seamless Planning, Articulated Engineering, and Dedicated Team work reinforced with supportive Leadership.
Contact us and see what we can do together at SALES@LPTECHNOLOGY.CO.KE
Leave Your Comment